Monitoring Is a Safety Net, Not a Time Machine

Why archaeological monitoring works best as part of a larger cultural-resource strategy.

Imagine a construction crew excavating a trench for a new utility line. An archaeological monitor is standing nearby, watching the excavation.

The backhoe exposes a concentration of artifacts. The monitor recognizes that the material may represent a previously unidentified archaeological site.

Now what?

The answer depends considerably on what happened before construction began.

Was the area investigated? Were buried archaeological deposits anticipated? Is there an approved discovery procedure? Who has authority to suspend work? Who needs to be notified?

These questions illustrate an important distinction: archaeological monitoring is a valuable tool, but it is not a substitute for thoughtful cultural-resource planning.

What Archaeological Monitoring Actually Does

Archaeological monitoring generally involves a qualified archaeologist observing specified ground-disturbing activities to identify cultural materials, document observations, and initiate established procedures when potential discoveries occur.

It can be especially useful where buried deposits may be present but are difficult to identify through conventional surface investigations.

Monitoring may also be required as part of a project’s environmental commitments, historic-property treatment measures, or agency-approved discovery procedures.

But monitoring has an inherent limitation.

By the time an archaeological deposit becomes visible in an excavation, some disturbance may already have occurred.

A monitor can recognize a discovery and help prevent additional damage. They cannot reverse the disturbance that exposed it.

That’s why monitoring should be understood as one component of a larger identification, avoidance, and treatment strategy.

Identification and Monitoring Serve Different Purposes

For federal undertakings subject to Section 106 of the National Historic Preservation Act, agencies must make a reasonable and good-faith effort to identify historic properties that may be affected by a project.

That effort may involve records research, consultation, field survey, subsurface testing, or other appropriate methods.

The regulations also recognize that identification cannot always be completed in a single step. Phased identification may be appropriate for large corridors, restricted-access areas, and certain other circumstances, subject to applicable regulatory requirements.

Monitoring can play an important role in these situations.

The critical distinction is whether monitoring has been selected as part of a reasoned identification or treatment strategy—or simply added late in project planning as a precaution.

Those are not necessarily equivalent.

A Discovery Plan Should Answer Practical Questions

An effective monitoring and discovery plan needs to work in the field, not just on paper.

Before construction begins, the project team should understand:

Where and when is monitoring required?

Not every excavation necessarily presents the same archaeological risk. Monitoring requirements should reflect available information, consultation, project conditions, and applicable commitments.

Who has authority to suspend ground disturbance?

The monitor, construction superintendent, environmental compliance manager, and agency representative should understand their respective responsibilities. Stop-work authority should be established clearly rather than assumed.

What happens when something is discovered?

The plan should establish procedures for protecting the discovery, notifying the appropriate parties, evaluating its significance, and determining whether and how work may resume.

How are consulting parties involved?

Discovery procedures must account for applicable consultation requirements, including those involving Indian Tribes and Native Hawaiian organizations. Tribal cultural knowledge and Tribal monitoring responsibilities are not interchangeable with archaeological monitoring, and neither replaces required government-to-government consultation.

How will the work be documented?

Daily observations, discovery records, notifications, decisions, and final reporting should be sufficiently clear to demonstrate what occurred and how the project responded.

The exact procedures depend on the governing agreement, permit conditions, applicable law, and agency requirements.

The Cost of an Unclear Plan

Consider two otherwise similar construction projects.

On the first, the archaeological monitor identifies a potential discovery, but the construction crew is uncertain whether excavation should stop. The superintendent calls the environmental manager, who contacts the consultant, who then tries to determine the applicable notification requirements.

Meanwhile, equipment and personnel are waiting.

On the second project, the same discovery occurs, but the responsibilities are already established. The crew protects the area, the appropriate personnel are notified, and the project follows an agreed process for evaluating the discovery and determining next steps.

Neither project can guarantee that unexpected archaeological materials will never be encountered.

But the second is better prepared to respond responsibly and efficiently.

Good Monitoring Begins Before Construction

Archaeological monitoring is most effective when it is supported by appropriate prior investigations, meaningful consultation, clear procedures, and coordination with the construction team.

That preparation helps protect cultural resources while reducing uncertainty when discoveries occur.

It also recognizes something important about archaeological work: not every discovery can be anticipated, and not every risk can be eliminated.

The objective is to make informed decisions before construction begins—and to ensure that the people responsible for implementing those decisions know what to do when conditions change.

You can’t plan every discovery. You can plan what happens next.


Further Reading

Spindrift is Open for Business!

OpenForBus

Spindrift staff are all safely teleworking at home and here to serve our customers during the stay at home period for Covid-19. We can still provide proposals now for work once the orders are lifted, and can start working on desktop efforts to streamline project reporting once we can safely resume fieldwork efforts.

We are also checking in personally with our customers during this time to see how you're doing and how we can be of assistance. Stay healthy and safe!

Below please find some helpful resources. This page will be updated regularly, so check back. Let's get through this together!

Water is Life: Sustainability Means Clean Recycled Water

Spindrift and itʻs clients support sustainable development initiatives like Pure Water San Diego, the City of San Diego's phased, multi-year program that will provide one-third of San Diego's water supply locally by 2035. The Pure Water San Diego Program will use water purification technology to clean recycled water and produce safe, high-quality drinking water for the region. The Program offers a cost-effective investment for San Diego's water needs and will provide a reliable, sustainable water supply to meet increasing population growth in a coastal Mediterranean-like climate.

Our demand for water on hot, sunny, and dry summers is only going to intensify with increased population in the region, creating an unsustainable situation. We can no longer afford to let our treated waste water discharge into the ocean at the Point Loma Waste Water Treatment Plant.

Weʻre thrilled to have worked on several projects permitting a variety of different water and pipeline-related projects similar in nature to the Pure Water Program:

  • Cultural Resources Section 106 Inventory for the Replacement of Three Borrego Water District Reservoir Tanks, San Diego and Imperial Counties, California (2018-015)
  • Cultural Resources CEQA Plus Section 106 Inventory Survey of the Pond 20 Wetlands Mitigation Bank Project, City of Imperial Beach, San Diego County, California (2018-008)
  • Cultural and Biological Resources CEQA Inventory for the Western Municipal Water District La Sierra Pipeline and Sterling Pump Station and Reservoir Construction Management Project, City of Riverside, Riverside County, California (2017-005)
  • Cultural and Biological Resources CEQA Inventory for Tecolote Canyon Trunk Sewer Improvement Project, City of San Diego, San Diego County, California (2016-009)
  • Cultural Resources CEQA Inventory Survey and Paleontological Records Search for the Rainbow Municipal Water District Gird to Monserate Hill Water Line Design Project, Fallbrook, San Diego County, California  (2015-007)
  • Cultural Resources CEQA Plus Section 106 Inventory  Survey for the Cool Valley Reservoir Cover Replacement Project, Valley Center, San Diego County, California (2015-006)
  • Cultural Resources CEQA Plus Section 106 Inventory  Survey for the Pacific Beach Pipeline Project, City of San Diego, San Diego County, California (2015-004)

However, we also have experience with environmental compliance during the implementation of projects similar in nature to the Pure Water San Diego Pipeline project:

  • Cultural and Biological Resources Monitoring for the Western Municipal Water District La Sierra Pipeline and Sterling Pump Station and Reservoir Construction Management Project, City of Riverside, Riverside County, California (2017-005)
  • Archaeological Monitoring for the Rainbow Municipal Water District Gird to Monserate Hill Water Line Design  Project, Fallbrook, San Diego County, California  (2015-007)
  • Archaeological Work Plan and Monitoring Services for Design/Bid/Build DLA Project RM 13-1849; Repair Miramar Fuel Pipeline, NAVSUP Fleet Logistics Center (FLC), Naval Base Point Loma, City of San Diego, San Diego County, California (2015-010)

We are actively seeking more opportunities like these to focus on sustainable development projects in the region that contribute to a better standard of living for residents in our community. Please email us or call 858-333-7202 for a complimentary cost proposal for more projects that ensure locally sourced, drought-proof drinking water to our region.